Kent Design & Development Award 2018 Shortlist
04/09/2019
Shortlisted for the Kent Design & Development Awards 2018.
moreMidkent College, September 2018
04/09/2018
This week sees the completion of our first Further Education project - multi-trade workshops for the Medway and Maidstone campuses of MidKent College.
moreGreat Yarmouth Marketplace
27/04/2018
We don't usually take part in open design competitions, but January was a slow month, and we thought it would be fun to try our hand at the competition for the revitalisation of Gr...
moreNew Sixth Form Centre for Cranbrook School
31/08/2017
Our conversion of a former ‘60s gym hall into a new sixth form centre for Cranbrook School has completed in time for the new 2017/2018 academic year. Here are some pictures of the...
moreA Happy Client
19/06/2017
The first ever Medway Design and Regeneration Awards was held on Friday the 16th June to celebrate the past 10 years of new development and regeneration in Medway.
moreGravesend Borough Market
28/04/2017
Chartered in 1268, Gravesend Borough Market began as an open market with a few permanent buildings. The current market hall, designed by local architect E.J.Bennett, was completed...
moreRIBA South East Regional Awards 2014
23/06/2014
On the 20th May, our project for the extension of the chapels at Medway Crematorium won an RIBA South East Award 2014 along with 11 other projects ( including our favourite, Ditchl...
moreMedway Crematorium Complete
17/12/2013
A crematorium is a building of two halves; each half deals with a different aspect of the way we deal with our recently departed, our dead.
moreMedway Crematorium Steel Sun ScreenBrise Soleil Installation
05/11/2013
On Saturday 2nd November, the Brise Soleils were finally installed at both newly extended chapels at Medway Crematorium.
moreMultiple deliveries of breath
12/10/2013
When Clays first encountered High Halstow Village Hall, we were met with an exhausted 1960’s building which had fallen victim to years of vandal abuse and lack of maintenance funds...
moreCase Study: Concrete Repairs to ‘60s RC frame buildings
07/06/2013
The main teaching block and science block of the school were built in 1967. Both are reinforced concrete frame buildings that featured exposed reinforced concrete columns and windo...
moreMedway Crematorium update
22/04/2013
Phase 1 works at Medway Crematorium— east chapel extension, new cremator plant, extended car park— are nearly complete. Phase 2 ( west chapel extension ) is scheduled to complete i...
more